Update 5.0 to Meghdoot 7.0 released on 31.12.2012. The update indent for NREGS module. the same can be downloaded from following ftp address ftp://ftp.ptcinfo.org/Meghdoot7/Updates/Update-5(NREG)/ 


Read me

Upgradation procedure for NREG in c/w eMO Client
  • ·        Ensure that your emo database is already upgraded with version 7 update 3. 
  •      In offices having Sanchay post latest version installed and NREGAEMO database is available, please upgrade the same with NREGAEMO script provided.
  • ·        Stop eMO client exe if running. Replace existing eMOclient.exe available in eMO client installation path with new eMO client exe provided in upgradation.
  • ·        For the first time, when you run new eMO client exe, it will prompt to enter Sanchay post server details 


  • ·        Enter Sanchay post server name if Sanchay Post server is available in that office else select not available and click on OK.



  • Your system will now be ready for receipt of Sanchay post related files through eMO client from central server if server details were provided.



  • For adding Sanchay post codes, option is available in Divisional administrator web login of eMO. Reports regarding NREG are available under Reports menu.



  • Please select the eMO Office Name and update Sanchay post code used for that PO.



Wednesday, 5 December 2012

Non reflection of eMOs received in DET


Problem: It is  to report that after the installation of new version of Meghdoot software, eMOs received today (Sl no.29 of Data extracted value)  are not getting extracted in DET But the eMOs issued for delivery,brought back,returned to sender and received missent are captured in the DET. 


Solution: Download
Please run attached scripts. Then do postman day-end today and run DET for today. Then check DET dashboard whether data appear correctly. 

If it is correct,then remove old project arrow files for the dates on which issue occurred from TXD folder. Then do postman day-end for those dates and run DET for those dates again. The issue will get resolved.

--
With Regards,
Help Desk
Centre for Excellence in Postal Technology
Nazarbad, Mysore 570010
Karnataka, India
Ph:   0821 2449015 
Fax:  0821 2440526

Tuesday, 30 October 2012

Bug in Update 3 while taking return from postman after modifiying the Postman name

In Meghdoot Update 3 after modifying the Postman name in Supervisor. The postman name appears twice while taking returns (Old Postman Name+New Postman Name). Because of this bug day end cannot be done. Now CEPT MYsore has Provided two exl to solve this issue, One Exe and Two dll to solve this issue

Postman exl         
         &                           Download
Treasury exl 

New postman exe and DLL   Download

Monday, 29 October 2012

New solution to eliminate bug in Meghdoot update 3

In Update 3 of Meghdoot there is no option to return eMO,which was put for deposit


Sunday, 23 September 2012

Common Problems and solutions to update 3

Application
Problem Noticed
Solution
eMO
Collation Errors while executing eMO script files
Please run the emo.exl
Treasury
Discrepancy in Generation of Voucher no. automatically while using Bank Remittance Option in Treasury Module when more than one remittance was made to the Bank on a particular day
Please run Treasury,exl

Sub Accounts
 Invalid Column name 'remittancedetails3'
Please replace the new
Postman
Error "Dly_Select_EVPForIssuingtoPostmen has too many arguments”
Please replace the new  Postman exe  and run eCounter.exl  
AccountsPBS
Script execution error  in offices where SQL 2000 is running
Please run Schedule.exl
Despatch
error while operator logging into Despatch Application for the red bag entries clearance
Please replace the new Despatch.exe and run Counter.exl
RNet Client
(CRC)
Syntax Error at the time of HVMO List Preparation
Please replace the new RNet.exe

-do-
List of BPC/MBCs not coming for the Bag Receipt option
Please follow the below steps:
 1)Please run the RegisterNet.exl
2) Give request for office master and hub master.
3) After the receipt of the data, first upload the office master and then the hub master.
R Net communication
Error Message in the log file "internet connection is Unavailable due to internet connectivity.
Please replace the new
-do-
Error “Channel http is not registered with remoting services”
Please register RegisterCACft.exe

Friday, 21 September 2012

Error in Update 3 to Meghdoot 7-Postman

If u come across this kind of error During Opening bag in Postman use this solution



Error in update 3 to Meghdoot 7.0-Postman

While invoicing eMO to B.O although u have invoiced the eMO once to B.O the same eMO will be here for invoicing.If u come across this error while Invoicing eMo to B.O use the Solution

Note:-This solution is a must in all offices

Wednesday, 19 September 2012

Error in Postman After Upgradation of Update 3


if u come come across a error after upgradation of Update 3 please use the patch Download from here

Sunday, 16 September 2012

Upgradation Procedure of Update 3 to Meghdoot 7.0


 Please upgrade the applications in the following order:(Manual upgradation) or Use Installer Application from Update 3 CD


Please ensure u have take back up of all data base, MDB and Day end is over in all modules.After that do up gradation in the following order 



  1.                         eMO
  2.                         ePayment
  3.                         Point of Sale
  4.                         Despatch
  5.                         Sub Accounts
  6.                         Treasury
  7.                         Postman
  8.                         AccountsMIS
  9.                         R Net Communication
  10.                         MO Compilation
  11.                         Accounts
  12.                         AccountsPBS 


Update 3 to Meghdoot 7.0


    The update 3 for meghdoot 7.0 installed on 15.09.2012.It introduced to meet the changing requirements of the customers Department is making efforts to upgrade the existing products or introducing new products. This update takes care of all the upgrades and new products being introduced by the Department.


The most salient features of this update are

i).    Customized installer for upgrading Meghdoot to update-3.
ii).   Online acceptance of fee for entrance examination.
iii). Disabling booking of Registered letters without barcode.
iv). Offline booking of WNX articles.
v).   e-Money order Compilation
vi). MNOP implementation in Rnet