Please upgrade the applications
in the following order:(Manual upgradation) or Use Installer Application from Update 3 CD
Please ensure u have take back up of all data base, MDB and Day end is over in all modules.After that do up gradation in the following order
- eMO
- ePayment
- Point of Sale
- Despatch
- Sub Accounts
- Treasury
- Postman
- AccountsMIS
- R Net Communication
- MO Compilation
- Accounts
- AccountsPBS
eMO
·
Stop eMO and eMO Client applications.
·
Ensure that other emo related applications viz., Point of Sale,
Postman etc; are not running.
·
Run emo.exl, eMOOffices.exl, eMOPincodes.exl, eMOBulkPayee.exl,
one by one, using Script Tool
·
Replace existing emo.exe and emoclient.exe available in respective
installation paths
with
the new versions provided
ePayment
·
Stop ePayment application.
·
Ensure that other ePayment related applications are not running.
·
Upgrade eCounter database by running eCounter.exl and
ECounterPOCodes.exl using script tool.
·
Replace the existing ePaymentClient.exe with the new
ePaymentClient.exe in ePayment Client installation path.
Point of Sale and Despatch
·
Run the script Counter.exl and Counte_1.exl using Script Tool.
·
Run the script ECounter.exl using Script Tool.
·
Replace the existing PointOfSale.exe with the new PointOfSale.exe
in Point Of Sale Client installation path.
·
Replace the existing Despatch.exe with the new Despatch.exe in the
installation path.
·
Copy the WNX.DLL to the Point Of Sale Client installation path and
register the DLL.
·
Copy the ClientSoftware folder to the C drive of each client
system and share the folder.
·
Copy the WNXMasterdata folder to the server.
Sub
Accounts
·
Run the script SUBACCOUNTS.exl using Script Tool.
·
Replace the existing SubAccounts.exe with the new SubAccounts.exe
in SubAccounts Client installation path.
Treasury
·
Run the scripts Treasury.exl, Treasury.exl using Script Tool.
·
Replace the existing Treasurer.exe with the new Treasurer.exe in Treasurer Client installation path
Postman
Postman
·
Replace existing Postman.exe with new one.
·
Replace existing EMODelivery.dll with new one.
·
Replace existing EVPDelivery.dll with new one.
·
Register both EMODelivery.dll and EVPDelivery.dll
·
Run Postman.exl with script tool.
AccountsMIS Client (DET)
o
Replace existing Meghdoot Accounts MIS Client.exe with new one.
o Replace the
ServerObject.dll and AccountMISClient.dll with the new ones.
R Net Communication for Post
Offices
·
Stop the R Net communication Client.
·
Ensure that the Counter and Postman database up‐gradation is over
successfully.
·
Take the backup of Old communication Client.
·
Replace the R Net communication exe with the new one.
·
Run the R Net communication exe.
·
If any error is reported, please send the mail to
support@ceptmysore.net with error screen shot and Log, TXD and RXD folders.
MO Compilation ( for Head Post Offices only)
·
Replace existing MOCompilation.exe with new one.
·
Run MOCompilation.exl with script tool.
·
Login as MO Compilation Supervisor and go to My Office Environment menu option
and provide all required details and click on ‘OK’ button to save entries.
Accounts ( for Head Post
Offices only)
·
Copy AccountsFix folder to Desktop.
·
Run AccountsFix.exe available therein.
·
Replace the existing Accounts.exe with the new one
AccountsPBS ( for Head Post Offices only)
o copy the new
Schedule.exe and replace the old exe with the new exe in the same location.
o Run the Schedule.exl
with script tool.
SIR,
ReplyDelete1.Please confirm the path in which the WNX Master data folder to be copied to the server
2. Whether the client software folder will be shared in all client machine where POS installed.